Latest Case Studies

  • Bank of Italia, London EC1

    Bank of Italia, London EC1

    Bank of Italia, London EC1


    Read More...
  • Excel Exhibition Centre, Phase 2

    Excel Exhibition Centre, Phase 2

    Excel Exhibition Centre, Phase 2


    Read More...
  • Grafton Street

    Grafton Street

    Grafton Street


    Read More...
  • Kings Cross Station, Redevelopment

    Kings Cross Station, Redevelopment

    Kings Cross Station, Redevelopment


    Read More...

Engineering Resources

Coolair have a large skilled installation workforce with a wealth of experience on a large array of projects. We have the ability to provide the necessary volume of labour to suit the various construction schemes and programs.

We are more than aware that the work volume fluctuates dramatically on large projects and have an enviable advantage of a large work force that can accommodate these rapid changes in attendance requirements.

Also in About Us